Installation guide

General recommendations

A) In the case of walls, installation must be carried out on a level surface of sufficient strength, built in accordance with the accordance of building laws.

B) In the case of a metal structure, the assembly must be made of materials with suitable wall thickness and bonded to each other in accordance with current metal processing regulations.

NOTE: the assembly method of the roller shutter indicated in the instructions should be considered as an example.

Roller shutter’s installation doesn’t require any special skills, but current health and safety laws should be obeyed, particularly regarding safety of electrical equipment and working at great heights. Be careful to not to crack your working surface during the installation. When using fasteners such as screws, be make sure they are suitable for your mounting surface.

Installation Guide

1)Put the guide rail (track) to the basis, vertically, then, screw it through the pre-drilled holes. (When doing this make sure it stands straight, using a level)

2) Make the same operation with the second guide rail.

3 )Put the box on the top of the guide rails. 

4) If you have the tape winch or the tape coiler, attach it to the place you like.

Installation Guide
Installation Guide
Cabana Shutter White

Request the quote